Bronte Beach Residence
Get a Free Quote
Plastering
Scope of works: Internal wall and ceiling plastering
Project Timeline: 9 weeks
Builder: Buildability Constructions
Architect: TZG architects
With high quality at the forefront of this build, every single surface of the interiors had to be extremely high quality. A lot of care was taken to ensure that every ceiling and wall was perfectly laser levelled. All joints had 4 coats of plaster and walls were level 5 set where critical and glancing light was present. It was a pleasure to work on a project of this high calibre.